Qiddiya Staff Accommodation
Full MEP delivery for a major entertainment district staff housing programme.
2025
Year
24,000 m²
Area / Scale
In Progress
Status
01
Built for performance, delivered with precision
YMCC is contributing MEP engineering and execution for the Qiddiya Staff Accommodation project — coordinating HVAC, electrical, plumbing, and fire protection systems across a large-scale residential development supporting the Qiddiya entertainment district.
Challenge met with engineering excellence
The Challenge
The programme required tight coordination between multiple MEP disciplines, phased handovers, and compliance with stringent hospitality and safety standards within an accelerated construction schedule.
Our Solution
We deployed integrated MEP teams with dedicated QA/QC, staged commissioning plans, and daily coordination with the main contractor to maintain the critical path across all residential blocks.
What we delivered on site
- 01HVAC systems design and installation
- 02Electrical distribution and lighting
- 03Plumbing and sanitary networks
- 04Fire detection and suppression systems
- 05Low-current and ELV coordination
- 06Testing, commissioning, and handover
Project gallery
Tap any photo to explore full-screen views from the field.
Project highlights at a glance
24K
Square metres
18
Months programme
5
MEP disciplines
ISO
Certified delivery
Outcomes that matter
- Integrated MEP delivery across multiple residential blocks.
- Coordinated fire protection and life-safety systems to code.
- On-schedule phased handovers aligned with main contractor programme.
How the project unfolded
Mobilization
Site setup, material logistics, and team deployment.
Rough-In
MEP rough-in across all blocks per approved drawings.
Commissioning
System testing, balancing, and client walkthroughs.
Handover
Final documentation and phased client acceptance.